PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing pour stops at Stair -4 Facing North-East  (800x600).jpg Pouring the concrete slab on grade Facing South (800x600).jpg Pouring the concrete slab on grade Facing South-West (800x600).jpg Duct hangers at the Main Lobby Facing West (800x600).jpg Griding and repairing the Main Steel at the Monumental Stairs Facing South (800x600).jpg Installing wire mesh at the 3rd floor Facing East (800x600).jpg Poured concrete at the slab on grade Facing West  (800x600).jpg
Previous pageNext page Griding and repairing the Main Steel at the Monumental Stairs Facing South (800x600)
Griding and repairing the Main Steel at the Monumental Stairs Facing South (800x600)